Step-by-Step Outdoor LED Screen Installation

1. Site Survey & Planning

  • Assess the location (visibility, distance, angle, height).

  • Check power supply availability and load capacity.

  • Confirm internet/network connectivity (LAN, 4G, WiFi).

  • Inspect the structure to ensure it can support the LED screen’s weight & wind load.

  • Take measurements for screen size and mounting design.


2. Structural Preparation

  • Design a steel frame or wall mount (engineer-approved).

  • Ensure structure is stable, rust-proof, and weather-resistant.

  • Mark the positions for mounting brackets and cable entries.


3. Power & Data Cabling

  • Install AC power lines with circuit breakers and surge protection.

  • Lay data cables (CAT6 / Fiber) for signal transmission.

  • Ensure proper grounding/earthing to protect against lightning and power surges.


4. Cabinet Installation

  • Hoist and fix LED display cabinets one by one, starting from the bottom row.

  • Align cabinets precisely using levels & alignment tools.

  • Secure them tightly to withstand wind & vibration.


5. Module & Panel Assembly

  • Install LED modules into each cabinet.

  • Connect power cables (from PSU to modules).

  • Connect data cables (from receiving card to modules).

  • Ensure module flatness & uniformity.


6. Control System Setup

  • Install receiving cards inside the LED cabinets.

  • Connect them to the sending card or video processor in the control room.

  • Configure screen layout using LED control software.


7. Testing & Calibration

  • Power on and check each cabinet/module.

  • Perform brightness & color calibration for uniform display.

  • Run test patterns to verify pixel mapping & resolution.

  • Check signal redundancy and backup power (if applicable).


8. Waterproofing & Sealing

  • Seal cabinet gaps with rubber gaskets / waterproof tape.

  • Ensure all cable entries are weatherproof.

  • Apply anti-rust coating on exposed steel structures.


9. Final Adjustments

  • Set optimal brightness levels for outdoor conditions.

  • Adjust viewing angle & content scaling.

  • Schedule automatic power on/off if supported.


10. Handover & Maintenance Training

  • Provide client training for basic operation & content upload.

  • Share maintenance guidelines (cleaning, fan checks, spare parts).

  • Schedule regular inspections (monthly or quarterly).

Key Features

Questions? You’re covered

01. How is the screen maintained?
  • Regular cleaning of LED modules & fans.

  • Checking power supply & signal cables.

  • Replacing faulty modules/cards when needed.

  • Performing monthly or quarterly inspections.

It depends on screen size and site preparation. On average:

  • Small (10–20 sqm): 2–4 days

  • Medium (30–50 sqm): 1–2 weeks

  • Large (100+ sqm): 3–6 weeks

Content can be uploaded via:

  • USB / Laptop (direct connection)

  • Wi-Fi / LAN network

  • 4G/5G control system

  • Cloud-based software (remote management)